4
Project Integration Management
7
4.1 Develop Project Charter
I
4.2 Develop Project Management Plan
P
4.3 Direct and Manage Project Work
E
4.4 Manage Project Knowledge
E
4.5 Monitor and Control Project Work
M&C
4.6 Perform Integrated Change Control
M&C
4.7 Close Project or Phase
C
Show all processes
5
Project Scope Management
6
5.1 Plan Scope Management
P
5.2 Collect Requirements
P
5.3 Define Scope
P
5.4 Create WBS
P
5.5 Validate Scope
M&C
5.6 Control Scope
M&C
Show all processes
6
Project Schedule Management
6
6.1 Plan Schedule Management
P
6.2 Define Activities
P
6.3 Sequence Activities
P
6.4 Estimate Activity Durations
P
6.5 Develop Schedule
P
6.6 Control Schedule
M&C
Show all processes
7
Project Cost Management
4
7.1 Plan Cost Management
P
7.2 Estimate Costs
P
7.3 Determine Budget
P
7.4 Control Costs
M&C
Show all processes
8
Project Quality Management
3
8.1 Plan Quality Management
P
8.2 Manage Quality
E
8.3 Control Quality
M&C
Show all processes
9
Project Resource Management
6
9.1 Plan Resource Management
P
9.2 Estimate Activity Resources
P
9.3 Acquire Resources
E
9.4 Develop Team
E
9.5 Manage Team
E
9.6 Control Resources
M&C
Show all processes
10
Project Communications Management
3
10.1 Plan Communications Management
P
10.2 Manage Communications
E
10.3 Monitor Communications
M&C
Show all processes
11
Project Risk Management
7
11.1 Plan Risk Management
P
11.2 Identify Risks
P
11.3 Perform Qualitative Risk Analysis
P
11.4 Perform Quantitative Risk Analysis
P
11.5 Plan Risk Responses
P
11.6 Implement Risk Responses
E
11.7 Monitor Risks
M&C
Show all processes
12
Project Procurement Management
3
12.1 Plan Procurement Management
P
12.2 Conduct Procurements
E
12.3 Control Procurements
M&C
Show all processes
13
Project Stakeholder Management
4
13.1 Identify Stakeholders
I
13.2 Plan Stakeholder Engagement
P
13.3 Manage Stakeholder Engagement
E
13.4 Monitor Stakeholder Engagement
M&C
Show all processes
ITTOs
Inputs
Tools and Techniques
Outputs
Others
Documents
Show all knowledge area
MENU
Toggle Menu
4 Project Integration Management
4 Project Integration Management
4 Project Integration Management.4.1 Develop Project Charter
4.1 Develop Project Charter
4 Project Integration Management.4.2 Develop Project Management Plan
4.2 Develop Project Management Plan
4 Project Integration Management.4.3 Direct and Manage Project Work
4.3 Direct and Manage Project Work
4 Project Integration Management.4.4 Manage Project Knowledge
4.4 Manage Project Knowledge
4 Project Integration Management.4.5 Monitor and Control Project Work
4.5 Monitor and Control Project Work
4 Project Integration Management.4.6 Perform Integrated Change Control
4.6 Perform Integrated Change Control
4 Project Integration Management.4.7 Close Project or Phase
4.7 Close Project or Phase
4 Project Integration Management.4.1 Develop Project Charter.Input
Input
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques
Tools and Techniques
4 Project Integration Management.4.1 Develop Project Charter.Output
Output
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques
Tools and Techniques
4 Project Integration Management.4.2 Develop Project Management Plan.Input
Input
4 Project Integration Management.4.2 Develop Project Management Plan.Output
Output
4 Project Integration Management.4.3 Direct and Manage Project Work.Input
Input
4 Project Integration Management.4.3 Direct and Manage Project Work.Output
Output
4 Project Integration Management.4.3 Direct and Manage Project Work.Tools and Techniques
Tools and Techniques
4 Project Integration Management.4.4 Manage Project Knowledge.Input
Input
4 Project Integration Management.4.4 Manage Project Knowledge.Tools and Techniques
Tools and Techniques
4 Project Integration Management.4.4 Manage Project Knowledge.Output
Output
4 Project Integration Management.4.5 Monitor and Control Project Work.Input
Input
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques
Tools and Techniques
4 Project Integration Management.4.5 Monitor and Control Project Work.Output
Output
4 Project Integration Management.4.6 Perform Integrated Change Control.Input
Input
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques
Tools and Techniques
4 Project Integration Management.4.6 Perform Integrated Change Control.Output
Output
4 Project Integration Management.4.7 Close Project or Phase.Input
Input
4 Project Integration Management.4.7 Close Project or Phase.Tools and Techniques
Tools and Techniques
4 Project Integration Management.4.7 Close Project or Phase.Output
Output
4 Project Integration Management.4.1 Develop Project Charter.Input.Business Documents
Business Documents
4 Project Integration Management.4.1 Develop Project Charter.Input.Agreements
Agreements
4 Project Integration Management.4.1 Develop Project Charter.Input.Enterprise Environmental Factors
Enterprise Environmental Factors
4 Project Integration Management.4.1 Develop Project Charter.Input.Organizational Process Assets
Organizational Process Assets
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques.Data Gathering
Data Gathering
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques.Interpersonal & Team Skills
Interpersonal & Team Skills
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques.Expert Judgment
Expert Judgment
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques.Meetings
Meetings
4 Project Integration Management.4.1 Develop Project Charter.Output.Project Charter
Project Charter
4 Project Integration Management.4.1 Develop Project Charter.Output.Assumption Log
Assumption Log
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Data Gathering
Data Gathering
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Interpersonal & Team Skills
Interpersonal & Team Skills
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Expert Judgment
Expert Judgment
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Meetings
Meetings
4 Project Integration Management.4.2 Develop Project Management Plan.Input.Project Charter
Project Charter
4 Project Integration Management.4.2 Develop Project Management Plan.Input.Outputs from Other Processes
Outputs from Other Processes
4 Project Integration Management.4.2 Develop Project Management Plan.Input.Enterprise Environmental Factors
Enterprise Environmental Factors
4 Project Integration Management.4.2 Develop Project Management Plan.Input.Organizational Process Assets
Organizational Process Assets
4 Project Integration Management.4.2 Develop Project Management Plan.Output.Project Management Plan
Project Management Plan
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Management Plan
Project Management Plan
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Documents
Project Documents
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Approved Change Requests
Approved Change Requests
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Enterprise Environmental Factors
Enterprise Environmental Factors
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Organizational Process Assets
Organizational Process Assets
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Project Management Plan Updates
Project Management Plan Updates
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Project Documents Updates
Project Documents Updates
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Deliverables
Deliverables
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Work Performance Data
Work Performance Data
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Issue Log
Issue Log
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Change Requests
Change Requests
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Organizational Process Assets Updates
Organizational Process Assets Updates
4 Project Integration Management.4.3 Direct and Manage Project Work.Tools and Techniques.Expert Judgment
Expert Judgment
4 Project Integration Management.4.3 Direct and Manage Project Work.Tools and Techniques.Project Management Information System
Project Management Information System
4 Project Integration Management.4.3 Direct and Manage Project Work.Tools and Techniques.Meetings
Meetings
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Project Management Plan
Project Management Plan
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Project Documents
Project Documents
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Deliverables
Deliverables
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Enterprise Environmental Factors
Enterprise Environmental Factors
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Organizational Process Assets
Organizational Process Assets
4 Project Integration Management.4.4 Manage Project Knowledge.Tools and Techniques.Interpersonal & Team Skills
Interpersonal & Team Skills
4 Project Integration Management.4.4 Manage Project Knowledge.Tools and Techniques.Expert Judgment
Expert Judgment
4 Project Integration Management.4.4 Manage Project Knowledge.Tools and Techniques.Knowledge Management
Knowledge Management
4 Project Integration Management.4.4 Manage Project Knowledge.Tools and Techniques.Information Management
Information Management
4 Project Integration Management.4.4 Manage Project Knowledge.Output.Project Management Plan Updates
Project Management Plan Updates
4 Project Integration Management.4.4 Manage Project Knowledge.Output.Lessons Learned Register
Lessons Learned Register
4 Project Integration Management.4.4 Manage Project Knowledge.Output.Organizational Process Assets Updates
Organizational Process Assets Updates
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Management Plan
Project Management Plan
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents
Project Documents
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Work Performance Information
Work Performance Information
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Agreements
Agreements
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Enterprise Environmental Factors
Enterprise Environmental Factors
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Organizational Process Assets
Organizational Process Assets
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques.Data Analysis
Data Analysis
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques.Expert Judgment
Expert Judgment
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques.Decision Making
Decision Making
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques.Meetings
Meetings
4 Project Integration Management.4.5 Monitor and Control Project Work.Output.Project Management Plan Updates
Project Management Plan Updates
4 Project Integration Management.4.5 Monitor and Control Project Work.Output.Project Documents Updates
Project Documents Updates
4 Project Integration Management.4.5 Monitor and Control Project Work.Output.Work Performance Reports
Work Performance Reports
4 Project Integration Management.4.5 Monitor and Control Project Work.Output.Change Requests
Change Requests
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Project Management Plan
Project Management Plan
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Project Documents
Project Documents
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Work Performance Reports
Work Performance Reports
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Change Requests
Change Requests
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Enterprise Environmental Factors
Enterprise Environmental Factors
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Organizational Process Assets
Organizational Process Assets
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques.Data Analysis
Data Analysis
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques.Decision Making
Decision Making
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques.Expert Judgment
Expert Judgment
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques.Change Control Tools
Change Control Tools
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques.Meetings
Meetings
4 Project Integration Management.4.6 Perform Integrated Change Control.Output.Project Management Plan Updates
Project Management Plan Updates
4 Project Integration Management.4.6 Perform Integrated Change Control.Output.Project Documents Updates
Project Documents Updates
4 Project Integration Management.4.6 Perform Integrated Change Control.Output.Approved Change Requests
Approved Change Requests
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Management Plan
Project Management Plan
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents
Project Documents
4 Project Integration Management.4.7 Close Project or Phase.Input.Business Documents
Business Documents
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Charter
Project Charter
4 Project Integration Management.4.7 Close Project or Phase.Input.Accepted Deliverables
Accepted Deliverables
4 Project Integration Management.4.7 Close Project or Phase.Input.Agreements
Agreements
4 Project Integration Management.4.7 Close Project or Phase.Input.Procurement Documentation
Procurement Documentation
4 Project Integration Management.4.7 Close Project or Phase.Input.Organizational Process Assets
Organizational Process Assets
4 Project Integration Management.4.7 Close Project or Phase.Tools and Techniques.Data Analysis
Data Analysis
4 Project Integration Management.4.7 Close Project or Phase.Tools and Techniques.Expert Judgment
Expert Judgment
4 Project Integration Management.4.7 Close Project or Phase.Tools and Techniques.Meetings
Meetings
4 Project Integration Management.4.7 Close Project or Phase.Output.Project Documents Updates
Project Documents Updates
4 Project Integration Management.4.7 Close Project or Phase.Output.Final Product, Service, Or Result Transition
Final Product, Service, Or Result Transition
4 Project Integration Management.4.7 Close Project or Phase.Output.Final Report
Final Report
4 Project Integration Management.4.7 Close Project or Phase.Output.Organizational Process Assets Updates
Organizational Process Assets Updates
4 Project Integration Management.4.1 Develop Project Charter.Input.Business Documents.- Business Case
- Business Case
4 Project Integration Management.4.1 Develop Project Charter.Input.Business Documents.- Benefits Management Plan
- Benefits Management Plan
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques.Data Gathering.- Brainstorming
- Brainstorming
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques.Data Gathering.- Focus Groups
- Focus Groups
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques.Data Gathering.- Interviews
- Interviews
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques.Interpersonal & Team Skills.- Conflict Management
- Conflict Management
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques.Interpersonal & Team Skills.- Facilitation
- Facilitation
4 Project Integration Management.4.1 Develop Project Charter.Tools and Techniques.Interpersonal & Team Skills.- Meeting Management
- Meeting Management
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Data Gathering.- Brainstorming
- Brainstorming
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Data Gathering.- Checklists
- Checklists
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Data Gathering.- Focus Groups
- Focus Groups
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Data Gathering.- Interviews
- Interviews
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Interpersonal & Team Skills.- Conflict Management
- Conflict Management
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Interpersonal & Team Skills.- Facilitation
- Facilitation
4 Project Integration Management.4.2 Develop Project Management Plan.Tools and Techniques.Interpersonal & Team Skills.- Meeting Management
- Meeting Management
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Management Plan.- Any Component
- Any Component
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Documents.- Change Log
- Change Log
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Documents.- Lessons Learned Register
- Lessons Learned Register
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Documents.- Milestone List
- Milestone List
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Documents.- Project Communications
- Project Communications
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Documents.- Project Schedule
- Project Schedule
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Documents.- Requirements Traceability Matrix
- Requirements Traceability Matrix
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Documents.- Risk Register
- Risk Register
4 Project Integration Management.4.3 Direct and Manage Project Work.Input.Project Documents.- Risk Report
- Risk Report
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Project Management Plan Updates.- Any Component
- Any Component
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Project Documents Updates.- Activity List
- Activity List
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Project Documents Updates.- Assumption Log
- Assumption Log
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Project Documents Updates.- Lessons Learned Register
- Lessons Learned Register
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Project Documents Updates.- Requirements Documentation
- Requirements Documentation
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Project Documents Updates.- Risk Register
- Risk Register
4 Project Integration Management.4.3 Direct and Manage Project Work.Output.Project Documents Updates.- Stakeholder Register
- Stakeholder Register
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Project Management Plan.- All Components
- All Components
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Project Documents.- Lessons Learned Register
- Lessons Learned Register
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Project Documents.- Project Team Assignments
- Project Team Assignments
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Project Documents.- Resource Breakdown Structure
- Resource Breakdown Structure
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Project Documents.- Source Selection Criteria
- Source Selection Criteria
4 Project Integration Management.4.4 Manage Project Knowledge.Input.Project Documents.- Stakeholder Register
- Stakeholder Register
4 Project Integration Management.4.4 Manage Project Knowledge.Tools and Techniques.Interpersonal & Team Skills.- Active Listening
- Active Listening
4 Project Integration Management.4.4 Manage Project Knowledge.Tools and Techniques.Interpersonal & Team Skills.- Facilitation
- Facilitation
4 Project Integration Management.4.4 Manage Project Knowledge.Tools and Techniques.Interpersonal & Team Skills.- Leadership
- Leadership
4 Project Integration Management.4.4 Manage Project Knowledge.Tools and Techniques.Interpersonal & Team Skills.- Networking
- Networking
4 Project Integration Management.4.4 Manage Project Knowledge.Tools and Techniques.Interpersonal & Team Skills.- Political Awareness
- Political Awareness
4 Project Integration Management.4.4 Manage Project Knowledge.Output.Project Management Plan Updates.- Any Component
- Any Component
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Management Plan.- Any Component
- Any Component
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents.- Assumption Log
- Assumption Log
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents.- Basis of Estimates
- Basis of Estimates
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents.- Cost Forecasts
- Cost Forecasts
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents.- Issue Log
- Issue Log
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents.- Lessons Learned Register
- Lessons Learned Register
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents.- Milestone List
- Milestone List
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents.- Quality Reports
- Quality Reports
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents.- Risk Register
- Risk Register
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents.- Risk Report
- Risk Report
4 Project Integration Management.4.5 Monitor and Control Project Work.Input.Project Documents.- Schedule Forecasts
- Schedule Forecasts
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques.Data Analysis.- Alternatives Analysis
- Alternatives Analysis
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques.Data Analysis.- Cost-Benefit Analysis
- Cost-Benefit Analysis
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques.Data Analysis.- Earned Value Analysis
- Earned Value Analysis
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques.Data Analysis.- Root Cause Analysis
- Root Cause Analysis
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques.Data Analysis.- Trend Analysis
- Trend Analysis
4 Project Integration Management.4.5 Monitor and Control Project Work.Tools and Techniques.Data Analysis.- Variance Analysis
- Variance Analysis
4 Project Integration Management.4.5 Monitor and Control Project Work.Output.Project Management Plan Updates.- Any Component
- Any Component
4 Project Integration Management.4.5 Monitor and Control Project Work.Output.Project Documents Updates.- Cost Forecasts
- Cost Forecasts
4 Project Integration Management.4.5 Monitor and Control Project Work.Output.Project Documents Updates.- Issue Log
- Issue Log
4 Project Integration Management.4.5 Monitor and Control Project Work.Output.Project Documents Updates.- Lessons Learned Register
- Lessons Learned Register
4 Project Integration Management.4.5 Monitor and Control Project Work.Output.Project Documents Updates.- Risk Register
- Risk Register
4 Project Integration Management.4.5 Monitor and Control Project Work.Output.Project Documents Updates.- Schedule Forecasts
- Schedule Forecasts
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Project Management Plan.- Change Management Plan
- Change Management Plan
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Project Management Plan.- Configuration Management Plan
- Configuration Management Plan
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Project Management Plan.- Scope Baseline
- Scope Baseline
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Project Management Plan.- Schedule Baseline
- Schedule Baseline
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Project Management Plan.- Cost Baseline
- Cost Baseline
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Project Documents.- Basis of Estimates
- Basis of Estimates
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Project Documents.- Requirements Traceability Matrix
- Requirements Traceability Matrix
4 Project Integration Management.4.6 Perform Integrated Change Control.Input.Project Documents.- Risk Report
- Risk Report
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques.Data Analysis.- Alternatives Analysis
- Alternatives Analysis
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques.Data Analysis.- Cost-Benefit Analysis
- Cost-Benefit Analysis
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques.Decision Making.- Voting
- Voting
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques.Decision Making.- Autocratic Decision Making
- Autocratic Decision Making
4 Project Integration Management.4.6 Perform Integrated Change Control.Tools and Techniques.Decision Making.- Multi-Criteria Decision Analysis
- Multi-Criteria Decision Analysis
4 Project Integration Management.4.6 Perform Integrated Change Control.Output.Project Management Plan Updates.- Any Component
- Any Component
4 Project Integration Management.4.6 Perform Integrated Change Control.Output.Project Documents Updates.- Change Log
- Change Log
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Management Plan.- All Components
- All Components
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Assumption Log
- Assumption Log
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Basis of Estimates
- Basis of Estimates
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Change Log
- Change Log
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Issue Log
- Issue Log
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Lessons Learned Register
- Lessons Learned Register
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Milestone List
- Milestone List
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Project Communications
- Project Communications
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Quality Control Measurements
- Quality Control Measurements
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Quality Reports
- Quality Reports
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Requirements Documentation
- Requirements Documentation
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Risk Register
- Risk Register
4 Project Integration Management.4.7 Close Project or Phase.Input.Project Documents.- Risk Report
- Risk Report
4 Project Integration Management.4.7 Close Project or Phase.Input.Business Documents.- Business Case
- Business Case
4 Project Integration Management.4.7 Close Project or Phase.Input.Business Documents.- Benefits Management Plan
- Benefits Management Plan
4 Project Integration Management.4.7 Close Project or Phase.Tools and Techniques.Data Analysis.- Document Analysis
- Document Analysis
4 Project Integration Management.4.7 Close Project or Phase.Tools and Techniques.Data Analysis.- Regression Analysis
- Regression Analysis
4 Project Integration Management.4.7 Close Project or Phase.Tools and Techniques.Data Analysis.- Trend Analysis
- Trend Analysis
4 Project Integration Management.4.7 Close Project or Phase.Tools and Techniques.Data Analysis.- Variance Analysis
- Variance Analysis
4 Project Integration Management.4.7 Close Project or Phase.Output.Project Documents Updates.- Lessons Learned Register
- Lessons Learned Register